Clorox Boiler Room

Project Details:

  • Install new turnkey cast-in-place concrete boiler room foundation

  • 14+ tons of steel

Challenges:

  • Monolithic pour including sump pit and trench drains

  • Installation of helical piles due to poor soil conditions

  • Mitigate excessive groundwater through use of temporary sump pits

  • Demanding pour schedule due to active adjacent railroad tracks